Final | 9/8/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Daryl DeGrange
|
|
|
Final Electrical Inspection on 50 KW Generator Installation. Last appointment of the day, if possible. Phone #: ###-#### Inspection requested via web by James Clark final ok
|
Electrical Rough-In | 9/7/2016 | 9/8/2016 | 9/8/2016 | A | PASS |
James Ady
|
|
|
Paul Phone #: ###-#### Underground only ok to cover
|