Final | 12/29/2016 | 12/30/2016 | 12/30/2016 | P | PASS |
Mark Moncarr
|
|
|
Final Building Q 1st and 2nd floor Phone #: ###-#### Inspection requested via web by Bob Stephens 1st and 2nd floor final ok. Building Q final
|
Final | 12/28/2016 | 12/29/2016 | 12/29/2016 | P | PART |
Mark Moncarr
|
|
|
Final building Q 3rd and 4th floor Phone #: ###-#### Inspection requested via web by Bob Stephens partial final maintenance personnel only
|
Electrical Rough-In | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | PEND |
Mark Moncarr
|
|
|
Rough electrical inspection on Building Q first and second floor plus permanent power. Call Doug. Thanks Phone #: ###-#### Inspection requested via web by Bob Stephens rooms inspected as per contractor notes
|
Permanent Service | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
Mark Moncarr
|
|
|
p/s u/g n ok
|
Electrical Rough-In | 9/8/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Mark Moncarr
|
|
|
third and fourth floor inspection of Building Q Phone #: ###-#### Inspection requested via web by Bob Stephens For future buildings layout of outlets must follow the NEC as per Daryl Degrange roughin ok to cover.
|