Final | 7/31/2017 | 7/31/2017 | 7/31/2017 | P | PASS |
Mark Moncarr
|
|
|
Doug Phone #: ###-#### Ok final. Corrections made.
|
Final | 7/27/2017 | 7/28/2017 | 7/28/2017 | P | FAIL |
Mark Moncarr
|
|
|
final first and second floor building G Phone #: ###-#### Inspection requested via web by Bob Stephens All single bed apts need A/C breaker changed to 2-pole 20. All units have 2-pole 25. Max fuse is 20
|
Final | 7/26/2017 | 7/27/2017 | 7/27/2017 | P | PART |
Mark Moncarr
|
|
|
Building G Final inspection 3rd and 4th floor Phone #: ###-#### Inspection requested via web by Bob Stephens Ok partial floors 3-4
|
Rough-In Permanent Service | 4/13/2017 | 4/13/2017 | 4/13/2017 | P | PASS |
Mark Moncarr
|
|
|
electrical rough building G 1st and 2nd floor and permanent power Phone #: ###-#### Inspection requested via web by Bob Stephens p/s u/g n ok both sides.
|
Electrical Rough-In | 4/11/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
Mark Moncarr
|
|
|
Electrical rough 3rd and 4th floor Building G Phone #: ###-#### Inspection requested via web by Bob Stephens 3rd and 4th only cover ok
|