Final | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | PASS |
James Ady
|
|
|
Inspection requested via web by Stacie Tasker final ok
|
Final | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PART |
James Ady
|
|
|
Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Partial final ok. Waiting on choke for grounding EMT
|
Final | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | FAIL |
James Ady
|
|
|
partial final // Tobias ###-#### 110.14Electrical connection, Dissimilar metals shall not be intermixed in terminal. (Sub panel j box) 110.22 Identification of Disc. (All fan Disc.) 110.26. Lighting cotrolled by auto matic means only shall not be permitted 250.66 E 1 Ferros metal raceways shall be bonded at each end. 250.104 A Metal water piping shall be bonded. 210.8 GFCI shall be readily accessible. (Drinking fountain)
|
Electrical Rough-In | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PASS |
James Ady
|
|
|
ceiling insp for office // Tobias ###-#### Ceiling in offices only ok to cover
|
Electrical Rough-In | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | PASS |
James Ady
|
|
|
Tobias Phone #: ###-#### 2 Walls in S office only ok to cover
|
Permanent Service | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | PASS |
James Ady
|
|
|
Ryan Phone #: ###-#### p/s u/g n ok
|
Electrical Rough-In | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | PASS |
James Ady
|
|
|
Ryan Phone #: ###-#### Partial cover NE corner soffit. Missing 1 can. All other soffits ok to cover
|
Electrical Rough-In | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | PASS |
James Ady
|
|
|
Danny Phone #: ###-#### East mechanical room only walls only ok to cover
|
Electrical Rough-In | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | PASS |
James Ady
|
|
|
Dave Phone #: ###-#### SW office walls, bath wall and hard lid and exterior lighting conduit only. rough in ok to cover
|
Permanent Service | 1/25/2017 | 1/26/2017 | 1/26/2017 | A | PASS |
James Ady
|
|
|
Dave Phone #: ###-#### p/s u/g n ok 3 meters needed
|
Permanent Service | 1/20/2017 | 1/20/2017 | 1/20/2017 | P | FAIL |
James Ady
|
|
|
Dave Phone #: ###-#### 110.24 Available Fualt Current Shall be feild marked
|
Conference | 10/20/2016 | 10/21/2016 | 10/21/2016 | A | DONE |
James Ady
|
|
|
Danny Phone #: ###-#### Discussed feeding fire pump from same transformer as main building supply
|
Electrical Rough-In | 10/1/2016 | 10/3/2016 | 10/3/2016 | A | PASS |
James Ady
|
|
|
We need an underground inspection, please. Contact is Danny Phone #: ###-#### Inspection requested via web by Stacie Tasker Conduit SW end of building and Conduit NE for Street lights and signs OK to cover
|
Electrical Rough-In | 9/27/2016 | 9/28/2016 | 9/28/2016 | A | PASS |
James Ady
|
|
|
We need an underground inspection. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker UG from trans to meter ok to cover
|
Electrical Rough-In | 9/22/2016 | 9/23/2016 | 9/23/2016 | A | PASS |
James Ady
|
|
|
We need an underground inspection. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Underground to main electrical room and 3in to UFER location ok to cover
|
Electrical Rough-In | 9/14/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
James Ady
|
|
|
We need a Ufer inspection. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker ufer ok to cover
|