Final | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Mark Moncarr
|
|
|
Autocover bonding Phone #: ###-#### Inspection requested via web by Lars Johnson Ok final for autocover bonding, rails, and motor.
|
Electrical Rough-In | 2/13/2017 | 2/14/2017 | 2/14/2017 | A | PASS |
Mark Moncarr
|
|
|
Swimming pool bonding Phone #: ###-#### Inspection requested via web by Lars Johnson All pockets for handrails and grabrails on pool and spa in place. EQ plane for pool and spa are tied together as one.
|
Electrical Rough-In | 9/20/2016 | 9/21/2016 | 9/21/2016 | A | PASS |
Mark Moncarr
|
|
|
Swimming pool partial underground and bonding Phone #: ###-#### Inspection requested via web by Lars Johnson As per Lars Johnson, 2 bonds at auto cover, bonded 2 lights at pool and 1 at hottub, pipe for lights stub in trench and other contractor is running pipe back to pool equipt room, bond for 1 ladder and a bond for 2 handrails, also 2 bonds for handicapped lifts.
|