Final | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kurt Carlson Final ok
|
Final | 10/19/2016 | 10/19/2016 | 10/19/2016 | P | NR |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kurt Carlson Not ready, discussed all LV boxes shall be closed for electrical final. Also discussed no GFCI protection for sump pump under sink nor Micro, not considered a kitchen since there is no 240v recept installed
|
Electrical Rough-In | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kurt Carlson Ceiling only ok to cover
|
Electrical Rough-In | 9/22/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
James Ady
|
|
|
Walls need inspected. Ceiling inspection to follow later. Door to suite 130 will be open from 9:00 am to 4:30 pm Thanks Kurt Carlson Phone #: ###-#### Inspection requested via web by Kurt Carlson walls only ok to cover
|
Electrical Rough-In | 9/21/2016 | 9/22/2016 | 9/22/2016 | A | FAIL |
James Ady
|
|
|
Space is suite 130 far west, 1st floor tenant, I need wall rough in, for cover. Any questions call Kurt Carlson ###-#### Inspection requested via web by Kurt Carlson Door locked No access
|