Final | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | PASS |
Tom Saunders
|
|
|
Randy Phone #: ###-####...ok to final
|
Electrical Rough-In | 9/21/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Tom Saunders
|
|
|
Sandra Phone #: ###-####
ok to cover
|
Conference | 9/21/2016 | 9/22/2016 | 9/21/2016 | P | PASS |
Tom Saunders
|
|
|
Sandra Phone #: ###-####
discussed addition and requirements for bathroom outlets and switching, 1 circuit for bath addition only and 1 for exterior outlet. junction box on exterior for the 2 new circuits. discussed tamper resistant gfi requirement, weather resistant outlet and damp location rated can trim for shower can
|