Final | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | PASS |
Rock A. Hudson
|
|
|
I will be down tomorrow to drop in a typed panel schedule. current one is hand written. Thank You- Steve Phone #: ###-#### Inspection requested via web by Steve Blackmer Final ok
|
Electrical Rough-In | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | PASS |
Rock A. Hudson
|
|
|
I will be down tomorrow to drop in a typed panel schedule. current one is hand written. Thank You- Steve Phone #: ###-#### Inspection requested via web by Steve Blackmer Listing confirmed and rough in ok
|