Final | 12/15/2016 | 12/15/2016 | 12/15/2016 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew White...
ok to final
|
Final | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | FAIL |
Tom Saunders
|
|
|
Mr. Neinhouse with Gorilla indicated that they have not touched anything since inspector was there last, and that he would take care of the issues, it does not soud like he will use us to correcting the lights and such that his company installed. -Thank you Phone #: ###-#### Inspection requested via web by Matthew White...
reason for fail is to keep permit open until a permit is pulled on work that was done at this location by persons without an electrical contractors license.
once permit is pulled and inspection scheduled for said work this permit will be able to be finaled. all work done on this permit is done and does not reflect negatively against contractor.
|
Final | 12/9/2016 | 12/9/2016 | 12/9/2016 | P | FAIL |
Tom Saunders
|
|
|
20 Light fixtures and most receptacels were installed by the contractor,NOT by the electrician, these items were done with out our knowledge Inspection requested via web by Matthew White...
1. electrical permit was pulled for service change only...work was performed beyond scope of permit and fees need to be updated for this work
2. electrical work at this address was done without an electrical permit being pulled. Work was done by a unlicensed person, electrician, electrical contractor. An electrical permit shall be pulled to cover other work being performed outside electrical permit ELE16-03139
|
Electrical Rough-In | 10/5/2016 | 10/6/2016 | 10/6/2016 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew White
full rough cover ok
|
Electrical Rough-In | 10/3/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew White
ok to cover....kitchen, new living room, and master bedroom....requesting another rough inspection be scheduled before final to look at upstairs bath rewire and demolition of outlets in master bath
|
Electrical Rough-In | 9/30/2016 | 10/3/2016 | 10/3/2016 | A | CANC |
Tom Saunders
|
|
|
Kelly Phone #: ###-####
inspection done on 9/30/16....permanent service inspection
|
Permanent Service | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | PASS |
Eric Story
|
|
|
p/s o/h rec ok
|
Permanent Service | 9/28/2016 | 9/29/2016 | 9/29/2016 | P | CANC |
Eric Story
|
|
|
Jose on site Phone #: ###-#### >> Inspection requested via web by Matthew White
|