Final | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | PASS |
Mark Moncarr
|
|
|
mike Phone #: ###-#### corrections made final ok
|
Final | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | FAIL |
Mark Moncarr
|
|
|
Michael Phone #: ###-#### 1. 424.44(G) Heated floors in all baths need GFI protection. 2. Outlet on front and back of house need to be Weather Resistant outlets. 3. Single pole lockout for hood in kitchen. 4. Lockouts for both ovens. 5. 2 outlets downstairs N. wall show open ground. 6. 210.8(A)(7) All outlets within 6' of sink in downstairs mechanical room need GFI protection.
|
Electrical Rough-In | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | PASS |
Mark Moncarr
|
|
|
rMike-ough in on heated floors in 2 bathrooms Phone #: ###-#### ok cover
|
Electrical Rough-In | 10/10/2016 | 10/11/2016 | 10/11/2016 | A | PASS |
Mark Moncarr
|
|
|
Mike Phone #: ###-#### corrections made ok cover
|
Electrical Rough-In | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | FAIL |
Mark Moncarr
|
|
|
Mike Phone #: ###-#### Grounds and neutrals cannot be under same screw in panel, you can double up grounds but cannot double up neutrals. A few locations where wires need to be repaired on inside wall where panel is located.
|
Conference | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | DONE |
Mark Moncarr
|
|
|
Mike-would like after 3 if possible Phone #: ###-#### talked to homeowner about code related questions as far required boxes needed and connectors needed for recess cans.
|