Final | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | PASS |
James Ady
|
|
|
Please call Gabe (###-####) 30 minutes ahead for access Phone #: ###-#### Inspection requested via web by Brad Girard Final ok
|
Electrical Rough-In | 10/18/2016 | 10/18/2016 | 10/18/2016 | P | PASS |
James Ady
|
|
|
Please call Gabe (###-####) 30 minutes ahead. Phone #: ###-#### Inspection requested via web by Brad Girard floor heat only ok to cover
|
Electrical Rough-In | 10/3/2016 | 10/4/2016 | 10/4/2016 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Girard Master bath only Rough in ok
|