Final | 2/6/2017 | 2/7/2017 | 2/7/2017 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Shawna Gates....
ok to final
|
Final | 1/31/2017 | 2/6/2017 | 2/6/2017 | P | PART |
Tom Saunders
|
|
|
Jake is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates...
downstairs complete....all upstairs excluding mechanical room...panel labelling...strapping outside risers and piping
|
Final | 2/1/2017 | 2/2/2017 | 2/2/2017 | P | PART |
Tom Saunders
|
|
|
Partial final Phone #: ###-#### Inspection requested via web by Shawna Gates...
downstairs...excluding trash room, mens bath, and outlets marked on plans
|
Electrical Rough-In | 1/31/2017 | 2/1/2017 | 2/1/2017 | A | PASS |
Tom Saunders
|
|
|
Ceiling. Jake is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates...
ceiling grid complete excluding panel room and front elevator 1st and 2nd floors
|
Electrical Rough-In | 1/27/2017 | 1/30/2017 | 1/30/2017 | A | PASS |
Tom Saunders
|
|
|
Ceiling Inspection. Jake is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates...
grid cover excluding front elevator first and second...main lab...hallway and south end building
|
Electrical Rough-In | 1/20/2017 | 1/23/2017 | 1/23/2017 | P | PASS |
Tom Saunders
|
|
|
Ceiling- Jake is the contact his cell is ###-#### Phone #: ###-#### Inspection requested via web by Shawna .....
upper floor ceiling cover excluding hallways, storage room, eval lab, break room, and mechanical room
|
Electrical Rough-In | 1/17/2017 | 1/19/2017 | 1/19/2017 | P | PASS |
Tom Saunders
|
|
|
Partial ceiling inspection. Jake is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates...
partial ceiling grid...1st floor entry, hall, and offices ok....left to inspect is all upstairs, front of elevator 1st floor, and all lab area 1st floor
|
Permanent Service | 1/11/2017 | 1/13/2017 | 1/13/2017 | A | CANC |
James Ady
|
|
|
Jake is the contact his cell no. ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Needed rough in
|
Electrical Rough-In | 1/13/2017 | 1/13/2017 | 1/13/2017 | P | PASS |
James Ady
|
|
|
Jake is the contact his cell no. ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Grounding of Transfer Switch ok
|
Permanent Service | 1/10/2017 | 1/12/2017 | 1/11/2017 | A | CANC |
Tom Saunders
|
|
|
Jake is the contact his cell no is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Permanent Service | 1/5/2017 | 1/6/2017 | 1/6/2017 | A | PASS |
Tom Saunders
|
|
|
jake 284 9897...
p/s u/g n ok
|
Permanent Service | 1/4/2017 | 1/5/2017 | 1/5/2017 | P | CANC |
Tom Saunders
|
|
|
jake...###-####...
rescheduled to 1/6/17
|
Permanent Service | 12/29/2016 | 1/4/2017 | 1/4/2017 | P | CANC |
Tom Saunders
|
|
|
Jake is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates...rescheduled to next day pm
|
Conference | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | PASS |
Tom Saunders
|
|
|
Jake is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates...
discussed moving of duct above panel....dedicated panel space 110.26(E)(1)
|
Electrical Rough-In | 11/21/2016 | 11/23/2016 | 11/23/2016 | A | PASS |
Tom Saunders
|
|
|
Jake is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates...
upper floor wall cover
|
Electrical Rough-In | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Tom Saunders
|
|
|
Jake is the contact his cell no is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates....
ok to cover walls south building....labs warehouse
|
Electrical Rough-In | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PASS |
Tom Saunders
|
|
|
Jake is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates....
ok cover front walls first floor
|
Conference | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | DONE |
Tom Saunders
|
|
|
Jake is contact his cell no is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates......discussed location of CT can and disconnect with gas meters and roof drain in proximity
|
Conference | 10/5/2016 | 10/5/2016 | 10/5/2016 | P | CANC |
Tom Saunders
|
|
|
Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|