Final | 12/21/2016 | 12/22/2016 | 12/22/2016 | A | PASS |
Rock A. Hudson
|
|
|
Re-routed conduit around new door opening, Installed circuits for 4 new pieces of equipment, Added several outlets This place is fairly big and cluttered, It might be best if you call me before you head that way so I can meet you to go through what we did Phone #: ###-#### Inspection requested via web by Troy Cobb Final ok
|
Electrical Rough-In | 12/22/2016 | 12/22/2016 | 12/22/2016 | P | PASS |
Rock A. Hudson
|
|
|
Re-routed conduit around new door opening, Installed circuits for 4 new pieces of equipment, Added several outlets This place is fairly big and cluttered, It might be best if you call me before you head that way so I can meet you to go through what we did Phone #: ###-#### Inspection requested via web by Troy Cobb All wiring fished or surface mounted. Rough in ok
|