Final | 5/16/2017 | 5/18/2017 | 5/18/2017 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Nichols Final ok
|
Electrical Rough-In | 11/9/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Nichols Up beds ok to cover
|
Conference | 10/14/2016 | 10/17/2016 | 10/17/2016 | A | DONE |
James Ady
|
|
|
Pre-Inspection with homeowner Phone #: ###-#### Inspection requested via web by Troy Nichols Talked about wire ampacity, arc fault protection, wall space outlets, tamper resistant receps. recomended service upgrade.
|