Electrical Rough-In | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | CANC |
James Ady
|
|
|
On site. Ready in am if your in the neighborhood. Phone #: ###-#### Inspection requested via web by Garrett Collins
|
Final | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
James Ady
|
|
|
On site. Ready in am if your in the neighborhood. Phone #: ###-#### Inspection requested via web by Garrett Collins Up beds and Bath Final ok
|
Electrical Rough-In | 10/18/2016 | 10/19/2016 | 10/19/2016 | A | PASS |
Mark Moncarr
|
|
|
RI inspection in master bed, guest bath and closet 2nd floor. 1st floor mech chase in bed room off dinning room. Basement level cut ins at Fireplace and bathroom rework to accommodate plumbing and new exhaust/ heater. heater is on its own 20 amp ckt. Existing 2nd floor m bed, new master ckt and small bedroom, including smoke detectors, will be AFCI. Guest bath on 2nd has dedicated 20amp. Plumber may be on site. I have a key hidden in a chicken on the back porch. call with any questions. Phone #: ###-#### Inspection requested via web by Garrett Collins met contractor on site ok cover
|