Final | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | PASS |
Mark Moncarr
|
|
|
Final on new 200 amp service install. Phone #: ###-#### Inspection requested via web by Adam Watkins Ok final for service.
|
Permanent Service | 12/8/2016 | 12/9/2016 | 12/9/2016 | A | PASS |
Mark Moncarr
|
|
|
Just to get panel sticker for Idaho Power cable install on Monday. Phone #: ###-#### Inspection requested via web by Adam Watkins p/s u/g n ok
|
Final | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | CANC |
Mark Moncarr
|
|
|
Final inspection on meter with service cables run, connected in meter box, ground bars driven and wired. Entrance wires left disconnected at main breaker panel pending hookup of service from Idaho Power. Phone #: ###-#### Inspection requested via web by Adam Watkins needed to be rough in
|
Electrical Rough-In | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Mark Moncarr
|
|
|
Final inspection on meter with service cables run, connected in meter box, ground bars driven and wired. Entrance wires left disconnected at main breaker panel pending hookup of service from Idaho Power. Phone #: ###-#### Inspection requested via web by Adam Watkins rough ok
|
Rough-In Permanent Service | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | DONE |
Mark Moncarr
|
|
|
Meter installed with conduit - conduit path is exposed to existing panel, so I''d like to make sure that all is well before closing up the wall material that was removed to allow for the conduit. Phone #: ###-#### Inspection requested via web by Adam Watkins Consultation on parts needed. Once finished running conductors from new meter to panel downstairs, then call for a permanent service.
|