Final | 3/31/2017 | 4/3/2017 | 4/3/2017 | A | PASS |
Eric Story
|
|
|
Brian Phone #: ###-#### Final ok
|
Electrical Rough-In | 11/30/2016 | 11/30/2016 | 11/30/2016 | P | PASS |
Eric Story
|
|
|
wade Phone #: ###-#### Pole bases on west existing parking lot ok pour
|
Electrical Rough-In | 11/22/2016 | 11/23/2016 | 11/23/2016 | A | PASS |
Eric Story
|
|
|
Matt Phone #: ###-#### Underfground south of existing parking lot ok cover
|
Electrical Rough-In | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Eric Story
|
|
|
Matt-part to cover some of the piping in south side of parcel near Targee Phone #: ###-#### Underground on west parking lot towards south ok cover
|
Electrical Rough-In | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PASS |
Eric Story
|
|
|
Wade Phone #: ###-#### West and south pole bases,underground far west across existing parking lot ok pour and cover
|
Electrical Rough-In | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | PASS |
Eric Story
|
|
|
Wade Phone #: ###-#### North section of parking lot running along freeway, light pole bases and grounding ok cover
|
Electrical Rough-In | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | PASS |
Eric Story
|
|
|
Underground... north parking lot and freeway frontage // Wade Phone #: ###-#### North underground on freeway side only ok cover
|
Electrical Rough-In | 11/9/2016 | 11/9/2016 | 11/9/2016 | P | PART |
Eric Story
|
|
|
Wade Phone #: ###-#### South underground cose to targee st ok cover
|
Final | 11/3/2016 | 11/4/2016 | 11/4/2016 | A | PASS |
Eric Story
|
|
|
under ground first thing Underground on east and west of parking lot ok cover
|
Electrical Rough-In | 11/3/2016 | 11/3/2016 | 11/3/2016 | P | NR |
Eric Story
|
|
|
Underground // Wade Phone #: ###-#### not ready
|