Final | 8/20/2017 | 8/21/2017 | 8/21/2017 | A | PASS |
James Ady
|
|
|
Inground hot tub ready for a final. Please call Jason if any questions Phone #: ###-#### Inspection requested via web by Kelly Felin final ok
|
Electrical Rough-In | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Eric Story
|
|
|
Ready for underground inspection. Please check bonding of rebar for block wall. Think it was inspected with bonding inspection but wanted to double check. Thank You Phone #: ###-#### Inspection requested via web by Kelly Felin Pool underground ok cover, Bonding was previously inspected and is ok.
|
Electrical Rough-In | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PART |
Eric Story
|
|
|
Need a bonding inspection for spa. Please call Jason ###-#### if any questions. Thank You Phone #: ###-#### Inspection requested via web by Kelly Felin Equipotential bonding around spa and all four corners and all connections ok cover
|