Final | 4/20/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Tom Saunders
|
|
|
final out home owner permit...ok to final...work was taken over by electrician ELE18-01488
|
Electrical Rough-In | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | PASS |
Tom Saunders
|
|
|
Tye Phone #: ###-####...underground ok...verified depth/sch 80 out of ground
|
Electrical Rough-In | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | NR |
Tom Saunders
|
|
|
underground // walk around to the back // please call her with any questions, Tina Reay Phone #: ###-####....miss communication on what needed to be seen for underground..will dig up in few locations and take pics plus has other pics..will discuss more when ready
|
Extend Permit 180 days | 5/10/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Rock A. Hudson
|
|
|
Due to scheduling issues owner own job has fallen behind needs extra time to complete. Extension OK
|
Conference | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | DONE |
Rock A. Hudson
|
|
|
Tye-please call prior to meet Phone #: ###-#### Discussed conduit depth, sch 80 above grade, who is allowed to do work, tamper, weather resistant, 1/2 of conduit installed previous will call for underground inspection, installing 240 volt between doors, 30 amp 120 volt RV, misc lights and receptacles inside and out.
|