Electrical Rough-In | 5/11/2020 | 5/18/2020 | 5/18/2020 | A | PASS |
Eric Story
|
|
|
Bill Phone #: ###-#### Needed P/S
|
Permanent Service | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PASS |
Eric Story
|
|
|
Bill Phone #: ###-#### p/s o/h rec ok
|
ELE-Aging Inspection | 3/11/2020 | 3/11/2020 | 3/11/2020 | | DONE |
Daryl DeGrange
|
|
|
Still under construction
|
ELE-Aging Inspection | 9/25/2019 | 9/25/2019 | 9/30/2019 | | DONE |
Eric Story
|
|
|
Still under construction
|
ELE-Aging Inspection | 6/26/2019 | 6/26/2019 | 6/27/2019 | | DONE |
Daryl DeGrange
|
|
|
Still under construction
|
Conference | 3/27/2019 | 3/29/2019 | 3/29/2019 | P | DONE |
Daryl DeGrange
|
|
|
Contact person (Bill) available at 2:30 for conference ; Phone #: ###-#### Discuss with homeowner requirement for wiring methods, relocating service meter main, overhead service clearances
|
Electrical Rough-In | 2/27/2019 | 2/28/2019 | 2/27/2019 | A | DONE |
Daryl DeGrange
|
|
|
Bill available during 12:00-1:00 lunch hour, ###-####
|
Electrical Rough-In | 4/10/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
Eric Story
|
|
|
would like call ahead - Underground; Bill Phone #: ###-#### u/g from house to shop only ok cover
|
Conference | 11/30/2016 | 12/1/2016 | 12/1/2016 | P | DONE |
Eric Story
|
|
|
Bill Phone #: ###-#### Discussed all code requirement for adding service in basement and adding all new circuits through out house, bathrooms,bedrooms and kitchen. Also talked about AFCI protection and GFCI protection. Owner will call for inspections as work is complete
|