Final | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Rock A. Hudson
|
|
|
Final on all live work Units 101, 102, 103, 104, 105 Early afternoon preferred Contact Bob Mott Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek All complete, signed off in office. Final ok
|
Final | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | PART |
Rock A. Hudson
|
|
|
Parking garage island has been removed with no plans to relocate. will do with island located at mezz. level. Court yard heat tape OK, Window trim under outdoor receptacle gasket level 3 patios, Check heat tape EPD at garage mini split locations and service receptacles. AFCI posted.
|
Conference | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | DONE |
Rock A. Hudson
|
|
|
Level 1- 106, Level 2- 202, 203, 204, 205, 206, 210, 213, 215, 216 noted as of 1-31-18
|
Final | 1/9/2018 | 1/10/2018 | 1/10/2018 | A | PART |
Rock A. Hudson
|
|
|
housing lobby 106 Phone #: ###-#### Inspection requested via web by Cathy Duchek Unit noted signed off in office, partial final ok
|
Final | 1/6/2018 | 1/8/2018 | 1/8/2018 | A | PART |
Rock A. Hudson
|
|
|
Bike parking 213, Restrooms 204-205, Dog wash 216, Telecom 206, Business center 202, Parcel Room 215, Management office 210, 203 fitness room Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas noted signed off in office partial final ok
|
Electrical Rough-In | 1/2/2018 | 1/2/2018 | 1/4/2018 | P | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection cover managers office Phone #: ###-#### Inspection requested via web by Cathy Duchek rough-in ok cover ceiling grid
|
Electrical Rough-In | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | PASS |
Rock A. Hudson
|
|
|
Live work #101 kitchen wall and dropped ceilings Phone #: ###-#### Inspection requested via web by Cathy Duchek Noted on contractor print rough in ok cover Discussed the cover of parking or housing lobby. This area wall cover was missed in noted from 9-1-17 inspection request. 345 recalls inspecting area.
|
Electrical Rough-In | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | PASS |
Rock A. Hudson
|
|
|
kitchen walls, dropped ceilings live works 101-105 Phone #: ###-#### Inspection requested via web by Cathy Duchek 101 not ready, 102 thru 105 live works walls and drop lids rough in ok cover
|
Electrical Rough-In | 9/1/2017 | 9/1/2017 | 9/1/2017 | P | PASS |
James Ady
|
|
|
Utility 212 wall and ceilings. corridor 211, fitness 203, management 210, business center 202, 204 and 205 restrooms dropped ceilings Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas listed ok to cover
|
Electrical Rough-In | 8/18/2017 | 8/18/2017 | 8/18/2017 | P | PASS |
Rock A. Hudson
|
|
|
communications room 206, Phone #: ###-#### Inspection requested via web by Cathy Duchek Kitchen grid Rex's pizza and unit noted rough in ok cover
|
Electrical Rough-In | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | PASS |
Rock A. Hudson
|
|
|
Perimeter walls in live work units 101-105 Phone #: ###-#### Inspection requested via web by Cathy Duchek Spray foam only on perimeter walls and ceiling OK
|
Electrical Rough-In | 7/19/2017 | 7/20/2017 | 7/20/2017 | P | PASS |
Rock A. Hudson
|
|
|
housing lobby 106 perimeter walls, parking lobby 107 walls Phone #: ###-#### Inspection requested via web by Cathy Duchek Noted on inspection print in office. Areas noted rough in ok cover
|
Electrical Rough-In | 5/2/2017 | 5/3/2017 | 5/3/2017 | P | PASS |
Rock A. Hudson
|
|
|
Rough- in walls only in 2nd floor. Management office 210, corridor 211, elevator lobby 201, business center 202, corridor 208, fitness center 203, bike parking 213, restrooms 204 ; 205, dog wash 216. Contact Fabian Luna Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek Rooms noted plus parcel room as noted on print in general contractors trailer wall rough in ok cover.
|
Electrical Rough-In | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | FAIL |
Rock A. Hudson
|
|
|
Lonny-fire pump Phone #: ###-#### 110.26- Clear work space shall be provided for all electrical equipment in room 113 for fire pump controller. 30" wide or width of equipment and 36" deep with voltage present. Work space shall have a height of 6 1/2' minimum. Clear egress path shall also be provided. Pending additional equipment to be added.
|