Final | 12/14/2016 | 12/14/2016 | 12/14/2016 | P | PASS |
Rock A. Hudson
|
|
|
We replaced existing panel with new 100 amp main breaker panel. Meter, masting, etc remains as existing. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Final ok
|
Permanent Service | 12/14/2016 | 12/14/2016 | 12/14/2016 | P | PASS |
Rock A. Hudson
|
|
|
We replaced existing panel with new 100 amp main breaker panel. Meter, masting, etc remains as existing. Phone #: ###-#### Inspection requested via web by Barbara Szurgot p/s o/h rec ok
|