Final | 2/6/2017 | 2/6/2017 | 2/6/2017 | A | PASS |
Eric Story
|
|
|
Please call prior to arrival for access Phone #: ###-#### Inspection requested via web by Patrick Paz Master bed and bath final ok
|
Electrical Rough-In | 1/4/2017 | 1/4/2017 | 1/4/2017 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Patrick Paz Spoke to Pat about loose UFER connection and need for access to ufer befor final rough in bath remodel ok
|