Final | 2/1/2017 | 2/1/2017 | 2/1/2017 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Patrick Paz Master bath final ok
|
Electrical Rough-In | 1/23/2017 | 1/24/2017 | 1/24/2017 | A | PASS |
Tom Saunders
|
|
|
please call prior to arrival. Floor heat inspection. Phone #: ###-#### Inspection requested via web by Patrick Paz....
ok to cover floor heat
|
Electrical Rough-In | 1/9/2017 | 1/10/2017 | 1/10/2017 | A | PASS |
Eric Story
|
|
|
please prior to arrival for access. Phone #: ###-#### Inspection requested via web by Patrick Paz Master bath ok cover
|