Final | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
James Ady
|
|
|
Final inspection for Wells Fargo Contact Jon Novak Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek no sign off sheet on site final ok
|
Electrical Rough-In | 8/7/2017 | 8/7/2017 | 8/7/2017 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling Inspection level 1 Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Area noted grid rough in ok cover
|
Electrical Rough-In | 7/12/2017 | 7/12/2017 | 7/12/2017 | A | PASS |
Rock A. Hudson
|
|
|
Soffit Inspection on Level 1 in Wells Fargo. Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Drop hardlids in each entance rough in ok cover
|
Electrical Rough-In | 7/6/2017 | 7/6/2017 | 7/6/2017 | P | PASS |
Rock A. Hudson
|
|
|
Wall Rough-in Inspection for the 1st floor of Wells Fargo Contact Jon Novak Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Wall rough in ok cover
|
Electrical Rough-In | 5/31/2017 | 5/31/2017 | 5/31/2017 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling inspection on level 3 Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Grid complete for phase 2. Rough in ok cover
|
Electrical Rough-In | 5/11/2017 | 5/11/2017 | 5/11/2017 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling Inspection Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Grid rough in as noted on contractor print rough in ok cover
|
Electrical Rough-In | 5/10/2017 | 5/10/2017 | 5/10/2017 | P | FAIL |
Rock A. Hudson
|
|
|
Ceiling Rough-In Inspection Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek 110.12(A)- Unused openings shall be closed by approved means. KO seals 300.15- Found fixture whip... needs terminated in a box or removed. 314.25- Open junction boxes...cover or remove. 330.30- MC if supported by support wires, support wire shall be secured at both ends.
|
Electrical Rough-In | 5/4/2017 | 5/4/2017 | 5/4/2017 | P | PASS |
Eric Story
|
|
|
Wall Rough-in inspection for Wells Fargo Restack Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek 3rd phase on third floor walls and reception hard lid ok cover
|
Electrical Rough-In | 4/6/2017 | 4/6/2017 | 4/6/2017 | P | PASS |
Rock A. Hudson
|
|
|
Wall Rough-In Inspection Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Checked phase 1 for TCO OK
|
Electrical Rough-In | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling Rough-in inspection Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek All phase 1 grid as noted on contractor print rough in ok cover
|
Electrical Rough-In | 3/31/2017 | 3/31/2017 | 3/31/2017 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling Rough-In Inspection. Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Area noted on contractor print grid rough in ok cover
|
Electrical Rough-In | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | FAIL |
Rock A. Hudson
|
|
|
Ceiling Rough-In Inspection for Wells Fargo Restack Contact Jon Novak Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek 300.11- All cables shall be supported off grid including data cables.
|
Electrical Rough-In | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | PART |
Rock A. Hudson
|
|
|
Ceiling Rough-In Inspection Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek 3rd floor phase 1, grid as noted on contractor print rough in ok cover
|
Electrical Rough-In | 3/9/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Rock A. Hudson
|
|
|
Wall Rough-In Inspection for the Wells Fargo Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek North and west office walls as noted on contractor print rough in ok cover
|
Electrical Rough-In | 3/1/2017 | 3/2/2017 | 3/2/2017 | P | FAIL |
Rock A. Hudson
|
|
|
Rough-In Wall Inspection Contact Jon Novak Phone #: ###-#### Inspection requested via web by Cathy Duchek 300.4- 2 1/2" deep studs used. MC cable shall be protected from physical damage where passing thru a hole in a framing member where hole does not maintain 1 1/4" from framing surface. 300.4- MC cable shall not be secured within 1 1/4" surface of framing member.
|