Final | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PASS |
Eric Story
|
|
|
Greg Critchfield is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce Final for Fire Pump ok
|
Electrical Rough-In | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PART |
Eric Story
|
|
|
Greg Critchfield is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Bonding bushing will be placed or bushing used will be verified as a listed bonding bushing. Install for automatic transfer switch for fir pump ok to test, will call for final once testing is completed and paper work is on site.
|
Conference | 1/19/2017 | 1/23/2017 | 1/23/2017 | A | DONE |
Eric Story
|
|
|
Greg Critchfield is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce Discussed wiring methods for for replacement of fire pump controll and transfer switch and bringing it to code with listed fire control panels. Will receive the proper one line diagram once engineer has sent it to EC and will review once it's recieved.
|