Final | 2/1/2017 | 2/1/2017 | 2/1/2017 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Shannon Wall final ok
|
Electrical Rough-In | 1/27/2017 | 1/30/2017 | 1/30/2017 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Shannon Wall UL listing of equipment ok. Discussed moving breakers around in existing panel to make room for 60 solar main Informed Contractor needed to go back through project approval to make sure fire codes are met. Rough in ok
|