Final | 5/24/2017 | 5/25/2017 | 5/25/2017 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt Ok final. Corrections made.
|
Final | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt 210.12 all receptacles in a bedroom shall have GFCI protection (smokes) 110.25@422.30 All appliances shall have a lockout
|
Final | 5/10/2017 | 5/11/2017 | 5/11/2017 | A | NH |
Tom Saunders
|
|
|
Call 30 mins ahead for access, thank you Phone #: ###-#### Inspection requested via web by John VanZandt...
no access...no one home
|
Electrical Rough-In | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | PASS |
Tom Saunders
|
|
|
Floor heat insp. Phone #: ###-#### Inspection requested via web by John VanZandt...
floor ok to cover...discussed handicap tub power draw and location of gfi protection
|
Electrical Rough-In | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | CANC |
Tom Saunders
|
|
|
Floor heat insp Phone #: ###-#### >> Inspection requested via web by John VanZandt Inspection cancelled from web by: John VanZandt
|
Permanent Service | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Tom Saunders
|
|
|
Early pm if possible, service change. Thank you Phone #: ###-#### Inspection requested via web by John VanZandt....
p/s u/g rec ok
|
Electrical Rough-In | 1/30/2017 | 1/30/2017 | 1/30/2017 | P | PASS |
Tom Saunders
|
|
|
Late afternoon if possible thank you Phone #: ###-#### Inspection requested via web by John VanZandt....
ok cover rough in kitchen...second phase of remodel
|
Electrical Rough-In | 1/24/2017 | 1/25/2017 | 1/25/2017 | A | PASS |
Tom Saunders
|
|
|
Partial rough in on addition, waiting on kitchen to remove wall, Phone #: ###-#### Inspection requested via web by John VanZandt...
ok to cover new addition only...kitchen remodel still to do....floor heat will need inspection
for final check northside of addition stub outs 2-12/2, 1-14/2....also 10/3 stub under new addition
|