Final | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | PASS |
Daryl DeGrange
|
|
|
Final ok
|
Electrical Rough-In | 3/6/2017 | 3/8/2017 | 3/8/2017 | P | PASS |
Tom Saunders
|
|
|
Kevin Phone #: ###-####....
ok to final
|
Electrical Rough-In | 2/13/2017 | 2/14/2017 | 2/14/2017 | P | PASS |
Tom Saunders
|
|
|
Kevin Phone #: ###-####...
ok to cover...verify tamper resistant outlets on final...2 locations
|
Conference | 2/8/2017 | 2/9/2017 | 2/9/2017 | P | PASS |
Tom Saunders
|
|
|
Kevin Phone #: ###-####...
discussed work being done...wire stripping codes...make up in boxes...fishing wire in walls..scheduling of rough inspection then final..stapling of wire under house
|