Final | 10/5/2017 | 10/6/2017 | 10/6/2017 | A | PASS |
Mark Moncarr
|
|
|
Please call ahead for access - Susie Phone #: ###-#### ok final
|
Electrical Rough-In | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | PASS |
Tom Saunders
|
|
|
Bryan Phone #: ###-####...
ok to cover...new bedroom
|
Conference | 2/16/2017 | 2/17/2017 | 2/17/2017 | A | PASS |
Tom Saunders
|
|
|
Bryan Phone #: ###-####...
discussed whats needed to be done for rough in inspection...nailplating, stapling of wires...flat not on side...replace wire that sheathing been cut...remove old wiring...safe off existing wiring/proove not energized...ARC fault protection of all openings in bedroom-smoke detector, light, outlets....tamper resistant outlets to be installed
|