Final | 3/2/2017 | 3/2/2017 | 3/2/2017 | A | PASS |
Tom Saunders
|
|
|
opened permit to include a conference with contractor...ok to final
|
Conference | 3/2/2017 | 3/2/2017 | 3/2/2017 | A | PASS |
Tom Saunders
|
|
|
discussed with contractor about changing existing service from a temporary service to a permanent service...service shall be brought up to current codes...service disconnecting means shall meet the requirements of current code section 230.70
|
Temporary Service | 2/21/2017 | 2/21/2017 | 2/21/2017 | A | PASS |
Tom Saunders
|
|
|
Want meter re-connected to run outlets under panel for temp power construction. Phone #: ###-#### Inspection requested via web by David Nelson...
reconnect of power to energize temporary outlets for construction...existing service located on house
|