Final | 3/1/2017 | 3/2/2017 | 3/2/2017 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher Final ok
|
Electrical Rough-In | 2/23/2017 | 3/1/2017 | 3/1/2017 | P | CANC |
Eric Story
|
|
|
Need OK for Idaho Power to get turned back on. Phone #: ###-#### Inspection requested via web by Randy Fletcher Needed p/s
|
Permanent Service | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | PASS |
Eric Story
|
|
|
Need OK for Idaho Power to get turned back on. Phone #: ###-#### Inspection requested via web by Randy Fletcher p/s o/h rec ok
|