Final | 6/2/2017 | 6/2/2017 | 6/2/2017 | P | PASS |
Eric Story
|
|
|
Both side of the duplex is ready, 1215 and 1217, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren Final ok
|
Rough-In Permanent Service | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | PASS |
Eric Story
|
|
|
This was scheduled for the 3rd, I just looked online and im not sure why but it was cancelled? Any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren Rough-in and P/S was already inspected by James Ady and passed
|
Rough-In Permanent Service | 3/2/2017 | 3/3/2017 | 3/3/2017 | P | CANC |
James Ady
|
|
|
Any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren
|
Permanent Service | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | FAIL |
James Ady
|
|
|
Any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren 110.3 B Listed equipment shall be installed per man. specs. Slip joint installed upside down
|
Electrical Rough-In | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PASS |
James Ady
|
|
|
Any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren Rough in ok to cover.
|
Rough-In Permanent Service | 3/2/2017 | 3/3/2017 | 3/2/2017 | A | CANC |
James Ady
|
|
|
Any questions please let me know, thx, TW Phone #: ###-#### >> Inspection requested via web by Stephen Kren Inspection cancelled from web by: Stephen Kren
|
Electrical Rough-In | 2/28/2017 | 3/1/2017 | 3/1/2017 | A | NR |
James Ady
|
|
|
Both sides of the duplex are ready for an approval for cover inspection. I plan on scheduling the permanent service on a later date, any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren Not ready. Panels need stuffed and feeders pulled
|