Final | 4/24/2017 | 4/24/2017 | 4/24/2017 | P | PASS |
Tom Saunders
|
|
|
job complete...requirements from conference satisfied...permit ELE17-01163 pulled for work
|
Conference | 3/1/2017 | 3/3/2017 | 3/3/2017 | A | DONE |
Rock A. Hudson
|
|
|
Consult for service upgrade Contact Seth VanWassenhove to set up time and access. ###-#### Phone #: ###-#### Inspection requested via web by Cathy Duchek Discussed the replacement of a fused panel board located in basement in Electrical room B. Main electrical room has labels on 6 service disconnecting means, shall verify grounding electrode system and bonding of grounded conductors. From a 200 amp single phase sub disconnect in ELE room A, a new MC sub feed to ELE rm B to be install new 200 amp panel board. Any life safety issues shall be addressed if any. All existing panels on load side panel in ELE rm B will be up graded in future. Job to be done in phases as funds become available.
|