Final | 9/20/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Mark Moncarr
|
|
|
If you need to enter the house please call, otherwise the light and the disconnect box have been completed on the south side of the house. Thanks again!
Tim Phone #: ###-#### Inspection requested via web by Tim Vennell Ok final. Corrections made.
|
Final | 7/23/2017 | 7/24/2017 | 7/24/2017 | A | CANC |
Tom Saunders
|
|
|
All items at the pump house are rectified and ready for final inspection so that I can get power turned on later on Monday. Please let me know if you have any questions. Thanks again!
Blessings,
Tim Phone #: ###-#### Inspection requested via web by Tim Vennell...
will schedule once power is on to pump house and a few corrections on site are fixed
|
Permanent Service | 7/24/2017 | 7/24/2017 | 7/24/2017 | A | PASS |
Tom Saunders
|
|
|
All items at the pump house are rectified and ready for final inspection so that I can get power turned on later on Monday. Please let me know if you have any questions. Thanks again!
Blessings,
Tim Phone #: ###-#### Inspection requested via web by Tim Vennell
p/s u/g rec ok this is for service at pump house...main house is on already
|
Permanent Service | 6/29/2017 | 6/29/2017 | 6/29/2017 | A | PASS |
Tom Saunders
|
|
|
finalling this permit ok....removing pump house of permit...power has been turned on at house...future permit will be pulled to get power to pump house when needed
|
Final | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | FAIL |
Tom Saunders
|
|
|
Timothy Phone #: ###-####...
service for pump house needs grounding fixed...has been cut...250.66, 250.53
outlet in pump house needs GFI protection and cover plate installed
4 square box needs appropriate cover installed to safe off exposed wiring
|
Permanent Service | 3/20/2017 | 3/20/2017 | 3/20/2017 | P | PASS |
Tom Saunders
|
|
|
I am traveling but our realtor will let you in. This is a HUD home and the power has been off for more than a year and in order to do the home inspection, Idaho Power wants you to have a look. We know there are things that do need attention but we want to make sure it is at least safe to turn on the power to check the systems. Our Realtor is: Greg Davis and he will be ready as soon as you are. ###-####. Please call both of us if possible. Thank you in advance for all of your help. There are (2) 200 AMP breaker boxes in the garage and one "fed" in the house from the garage. It is in the back room. If you have any questions please call. Phone #: ###-#### Inspection requested via web by Tim Vennell....
p/s u/g rec ok
power is for home inspector to be able to do home inspection...open wires are safed off and panels are complete...there are issues that are not to code that will need addressed but home owner is aware of and home inspector will be aware of as well at inspection...home owner aware that permit will need a final and will not be finaled until issues addressed
|