Final | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Ok final.
|
Electrical Rough-In | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PASS |
Mark Moncarr
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Ok cover. Looked at pics on 9/5/17 for 3 cans in front entry soffit.
|
Electrical Rough-In | 9/5/2017 | 9/5/2017 | 9/5/2017 | A | PASS |
Mark Moncarr
|
|
|
walls Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Ok cover shell
|
Final | 9/5/2017 | 9/5/2017 | 9/5/2017 | A | CANC |
Mark Moncarr
|
|
|
final for shell permit Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Cannot final shell until power is suppllied to all exterior locations
|
Electrical Rough-In | 5/18/2017 | 5/18/2017 | 5/18/2017 | P | PASS |
Mark Moncarr
|
|
|
ug Inspection requested via web by Lee VanSchoiack Ok cover. Ground works inspection was done before backfill. Contractor took some pictures before cover. Mentioned to electricians that ground cover inspection needs to be requested before backfill.
|
Electrical Rough-In | 3/24/2017 | 3/27/2017 | 3/27/2017 | A | PASS |
Tom Saunders
|
|
|
ufer, around 10am Phone #: ###-#### Inspection requested via web by Lee VanSchoiack...
bare copper...ok to cover
|