Final | 5/8/2017 | 5/9/2017 | 5/9/2017 | A | PASS |
Tom Saunders
|
|
|
THHN pulled, warning labels applied, everything covered. Ready for final inspection. Phone #: ###-#### Inspection requested via web by Robert Conant...
job complete...ok to final
|
Electrical Rough-In | 5/3/2017 | 5/4/2017 | 5/4/2017 | A | PASS |
Tom Saunders
|
|
|
meet at 11 am...
system ul listed, piping correct, grounding correct...needs to replace wiring witth THHN..will have rewiring and labels done at final
|
Electrical Rough-In | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | DONE |
Tom Saunders
|
|
|
Pretty flexible on timing, just give me a few minutes notice. Ready to review current rough-in wiring including Panel, AC shutoff, inverter, DC shutoff, and solar panels. Phone #: ###-#### Inspection requested via web by Robert Conant...
rescheduling inspection for next day...homeowner ok with...time constrant will be better
|
Rough-In Permanent Service | 4/6/2017 | 4/10/2017 | 4/10/2017 | P | PASS |
Tom Saunders
|
|
|
Ground rods are in. Planning on service disconnect and panel replacement today. Early afternoon should have the new panel in place for inspection to resume service. Phone #: ###-#### Inspection requested via web by Robert Conant...
p/s o/h rec ok
|
Conference | 3/28/2017 | 3/29/2017 | 3/29/2017 | P | PASS |
Tom Saunders
|
|
|
Very flexible, just call a few minutes before you want to meet. Thanks, Rob Phone #: ###-#### Inspection requested via web by Robert Conant...
discussed PV system being installed, grounded system, UL listing, labelling, disconnect...thru discussion advised homeowner that the houses split bus panel will need to be replaced to add solar...further discussed what needed to be done to change out house panel to get away from split bus- updating of grounding, #6 min ground wire, addition of 2 ground rods
|