Final | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Eric Story
|
|
|
Call Rafael to discuss final for project. As close to 12 as possible. Phone #: ###-#### Inspection requested via web by Rafael Castillo Final ok could not locate sign off sheet
|
Final | 6/29/2017 | 6/30/2017 | 6/30/2017 | P | PART |
Eric Story
|
|
|
Call Rafael for complete final inspection primarily on the 1st floor (second floor to be inspected in the AM). As close to 2pm as possible, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Partial on 1st floor conference room @ 2nd floor addition temp oc ok
|
Electrical Rough-In | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PASS |
Eric Story
|
|
|
Call Rafael for grid ceiling inspection of stair 3. Begin final inspection on 2nd floor, 1st floor to schedule for final inspection in the afternoon. As close to 0900 as possible, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Stairway 3 ceiling ok cover
|
Electrical Rough-In | 6/23/2017 | 6/23/2017 | 6/23/2017 | A | PASS |
Rock A. Hudson
|
|
|
Call Chris for ceiling grid inspection on 2nd floor. Close to 10 AM please. Phone #: ###-#### Inspection requested via web by Rafael Castillo Discussed 410.62(C)(1)(b)- LED luminaires with flexible cords can terminate above grid if in a raceway and box is located not more than 6" above grid, pics to be taken. 1st floor storage room, 2nd floor- elevator lobby, stair lobby, rooms and areas 204, 205, 206, 207, 208, 221 storage rm grid rough in ok cover
|
Electrical Rough-In | 6/22/2017 | 6/22/2017 | 6/22/2017 | A | PASS |
Rock A. Hudson
|
|
|
Call Chris for ceiling grid inspection of Jr. ballroom. Phone #: ###-#### Inspection requested via web by Rafael Castillo JR ballroom grid, speakers not in at time of inspection, level 1hall grid, office 209 hardlid rough in ok cover
|
Electrical Rough-In | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | PASS |
Eric Story
|
|
|
Call Chris for ceiling grid inspections of offices and bathrooms on 2nd floor and bathrooms on 1st floor. As close to 930 am as possible please. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo 1st and 2nd floor bath and 2nd floor 6 offices suspended ceilings ok cover
|
Electrical Rough-In | 6/15/2017 | 6/16/2017 | 6/16/2017 | A | PASS |
Eric Story
|
|
|
Call Chris for inspection of stairwell 3 and bike storage walls/hard lid ceiling. As early as possible in the AM please, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Stair 3 and bike storage walls and hard lid ceiling ok cover. Did discuss moving of fire damper disc they are ok as completed.
|
Electrical Rough-In | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Rock A. Hudson
|
|
|
Call Chris for inspection of hard lid at break room 2nd floor. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Break room hardlid and discussed relocating dampers. They are providing access at new locations. Rough in ok cover
|
Electrical Rough-In | 5/31/2017 | 5/31/2017 | 5/31/2017 | A | PASS |
Rock A. Hudson
|
|
|
Call Chris for inspection of hard lids on 2nd floor. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo 1st floor bathroom soffit, 2nd floor hall, bath foyer soffit and bath soffit. Soffits and hardlid rough in ok cover
|
Electrical Rough-In | 5/24/2017 | 5/25/2017 | 5/25/2017 | A | PASS |
Eric Story
|
|
|
Call Chris for grid ceiling inspection at entrance D. As early in the morning as possible. Phone #: ###-#### Inspection requested via web by Rafael Castillo Areas as noted on print ceilings ok cover
|
Final | 5/25/2017 | 5/25/2017 | 5/25/2017 | A | PART |
Eric Story
|
|
|
Call Chris for grid ceiling inspection at entrance D. As early in the morning as possible. Phone #: ###-#### Inspection requested via web by Rafael Castillo Area in that convention will be held ok to occupy, main area of construction will be tarped off so public cannot access it. ceilings were the only touched in this area and safe for public.
|
Electrical Rough-In | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | CANC |
Eric Story
|
|
|
Call Chris for inspection of ceiling grid areas in Meadows, as close to 2pm as possible please, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Duplicate inspection performed inspection in AM
|
Electrical Rough-In | 5/24/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Eric Story
|
|
|
Call Rafael or Chris (###-####) for inspection of ceiling grid areas in the Meadows. As close to 0900 as possible, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Suspended ceilings as noted on print and drinking fountain wall ok cover
|
Electrical Rough-In | 5/23/2017 | 5/23/2017 | 5/23/2017 | A | PASS |
Eric Story
|
|
|
Call Rafael for grid ceiling inspection of lobby area. As close to 1030 as possible, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Valuation of project will be changed and permit will be adjusted accordingly once T&M job has been completed. Suspended ceiling in lobby as noted on print ok cover
|
Electrical Rough-In | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Eric Story
|
|
|
Call Rafael for inspection of hard lid ceilings on 1st and 2nd floor. As close to 12pm as posssible please. Phone #: ###-#### Inspection requested via web by Rafael Castillo Hard lids and walls as noted on print ok cover
|
Electrical Rough-In | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | PASS |
Eric Story
|
|
|
Inspection of walls on 2nd floor. As close to 1pm as possible, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo 2nd floor walls as noted on print ok cover
|
Electrical Rough-In | 4/19/2017 | 4/19/2017 | 4/19/2017 | P | PASS |
Eric Story
|
|
|
Rough in inspection for TV wall on 2nd floor and bathroom on 1st floor. As close to 1pm as possible, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Areas as noted on print 2nd floor tv wall and first floor bath ok cover
|
Electrical Rough-In | 4/13/2017 | 4/13/2017 | 4/13/2017 | A | PASS |
Eric Story
|
|
|
Call Rafael for inspection of walls on 2nd floor offices and 1st floor ballroom and women''s restroom area. As close to 0900 as possible, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo areas as noted on print walls only ok cover
|
Electrical Rough-In | 4/7/2017 | 4/7/2017 | 4/7/2017 | A | PASS |
Eric Story
|
|
|
Rough in of walls at patio. Inspection as close to 10am as possible please. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Phase 3 patio exterior walls ok cover
|
Electrical Rough-In | 3/20/2017 | 3/20/2017 | 3/20/2017 | A | PASS |
Eric Story
|
|
|
** copied from ELE16-02693 **
Call Rafael for ceiling grid inspection of the concourse level. As close to 10:00am as possible. Phone #: ###-#### Inspection requested via web by Rafael Castillo Ceilings in corridor as noted and underground for tying in existing branch circuits also ok cover
|
Electrical Rough-In | 2/13/2017 | 2/13/2017 | 2/13/2017 | A | PASS |
Eric Story
|
|
|
** copied from ELE16-02693 **
Call Rafael for inspection of concourse 1st level, floor boxes in ballroom, and 2nd floor west concourse ceiling. Preferably a 1-2pm time frame, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Areas as noted on print ok cover
|