Final | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by steve ragan needed p/s
|
Permanent Service | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Corrections fixed AFCC is 1,533 p/s u/g n ok
|
Final | 5/5/2017 | 5/8/2017 | 5/8/2017 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Needed permenant service inspection. 110.3- Expansion joint shall be installed as per manufacturers instructions. Barrel opening to face down so not to collect dirt or water. 110.24- Available fault current shall be posted prior to permenant service inspection.
|
Electrical Rough-In | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PASS |
Rock A. Hudson
|
|
|
Underground inspection Phone #: ###-#### Inspection requested via web by steve ragan Rough in ok cover
|
Electrical Rough-In | 4/3/2017 | 4/3/2017 | 4/3/2017 | P | NR |
Rock A. Hudson
|
|
|
Underground inspection Phone #: ###-#### Inspection requested via web by steve ragan Found 1 trench with gas only in it. Contact had not been to job yet. Will recall when ready.
|