Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberELE17-00913
StatusFinaled
Name TASKER ELECTRICAL CONSTRUCTION INC
Site Address 3135 E BARBER VALLEY DR
Project Name 
Customer Number 
ePlanReviewNo
Description
New: all labor, equipment and material for complete electrical system for new building
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/18/20177/19/20177/19/2017PPASS
DetailsJames Ady
Glen is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Final ok
Permanent Service7/8/20177/10/20177/10/2017PPASS
DetailsRock A. Hudson
Glen is our site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
At time of inspection Petra Inc. was trying to install a low voltage cable in lower gutter on far left side, told to remove or have a barrier installed for seperation. Called contact to inform of situation.
p/s u/g n ok
Permanent Service7/6/20177/7/20177/7/2017AFAIL
DetailsRock A. Hudson
Randy is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
110.24- Available fault current shall be posted prior to permenant service inspection.
250.24(A)(1)- Grounding electrode conductor shall terminate to the same terminal or bus to which the grounded conductor is terminated.
250.28- Main bonding jumper shall be installed as per manufacturers instructions.
Electrical Rough-In6/14/20176/15/20176/15/2017PPASS
DetailsJames Ady
Gary is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker hard lid only ok to cover
Electrical Rough-In6/8/20176/9/20176/9/2017PPASS
DetailsRock A. Hudson
Gary is the site contact. Phone #: ###-#### Inspection requested via web by Stacie Tasker
Discussed adding show window receptacles north and south windows and watch load calculation due to 20' sections.
Wall rough in ok cover
Electrical Rough-In4/27/20174/28/20174/28/2017PPASS
DetailsJames Ady
We need an underground inspection, please!
Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker underground too trans a cctv ok
Electrical Rough-In4/18/20174/19/20174/19/2017PPASS
DetailsJames Ady
We need an underground inspection, please. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Underground too mechanical room only ok to cover
Electrical Rough-In4/18/20174/19/20174/18/2017ACANC
DetailsJames Ady
We need an underground inspection, please.
Thank you! Phone #: ###-#### >> Inspection requested via web by Stacie Tasker Inspection cancelled from web by: Stacie Tasker
Electrical Rough-In4/5/20174/6/20174/6/2017APASS
DetailsJames Ady
We need Ufer inspection. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker UFER ok
Electrical Rough-In4/3/20174/4/20174/4/2017PCANC
DetailsJames Ady
We need a ufer inspection. Travis will be the contact.
Thank you! Phone #: ###-#### >> Inspection requested via web by Stacie Tasker Inspection cancelled from web by: Stacie Tasker