Final | 11/1/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Koomler Ok final. In SW corner there is a 5' bond jumper off perimeter bond for a possible handrail leading up to upper level where hot tub is. Talked to contractor, he is going to re-coil wire up put beneath landscape rocks.
|
Electrical Rough-In | 9/7/2017 | 9/8/2017 | 9/8/2017 | A | PASS |
Mark Moncarr
|
|
|
pool light potting equipotential deck plane Phone #: ###-#### Inspection requested via web by Kevin Koomler Ok cover. Potting and EQ plane
|
Electrical Rough-In | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Mark Moncarr
|
|
|
Bonding Phone #: ###-#### Inspection requested via web by Kevin Koomler 4 corners bonded ok cover
|