Final | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
James Ady
|
|
|
Owner is home Phone #: ###-#### Inspection requested via web by michael hunt final ok
|
Electrical Rough-In | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | PASS |
James Ady
|
|
|
Floor heat ok to cover Phone #: ###-#### Inspection requested via web by michael hunt floor heat only ok to cover
|
Electrical Rough-In | 8/14/2017 | 8/16/2017 | 8/16/2017 | P | FAIL |
Rock A. Hudson
|
|
|
Ok to cover tile floor heat system Phone #: ###-#### Inspection requested via web by michael hunt 110.3- Cold lead splice shall be installed in floor and recessed in sub floor as per manufacturers instructions. Owner called and spoke at 2:44pm, she asked if she could cover prior to next inspection. Informed cover is not approved and needed to reschedule until after inspection.
|
Final | 8/15/2017 | 8/16/2017 | 8/16/2017 | P | NR |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by michael hunt Will recall when ready
|
Electrical Rough-In | 4/13/2017 | 4/13/2017 | 4/13/2017 | P | PASS |
Rock A. Hudson
|
|
|
Home owners are at home. Thank you. Phone #: ###-#### Inspection requested via web by michael hunt Sub panel in basement, checked on RI. Master bed, bath and utility rough in ok cover.
|