Final | 6/15/2017 | 6/16/2017 | 6/16/2017 | A | PASS |
Eric Story
|
|
|
Fixed items from first inspection , job should be open. Phone #: ###-#### Inspection requested via web by robert feller Final ok
|
Final | 6/14/2017 | 6/15/2017 | 6/15/2017 | A | PART |
Eric Story
|
|
|
The job will be open we will not be there. We ran all exposed conduits, wire and hookup of bakery equipment no work in the front office area. Installed plastic guards around lights above bakery equipment. Phone #: ###-#### Inspection requested via web by robert feller Will need lockout for waterheater and GFCI protection for receptace within 6' of sink
|
Permanent Service | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | CANC |
Eric Story
|
|
|
We will be on the job in the morning, contact is Greg Phone #: ###-#### Inspection requested via web by robert feller Needed r/i and p/s
|
Rough-In Permanent Service | 4/25/2017 | 4/25/2017 | 4/25/2017 | P | PASS |
Eric Story
|
|
|
We will be on the job in the morning, contact is Greg Phone #: ###-#### Inspection requested via web by robert feller Conduit on exrerior bath wall ok cover p/s u/g n ok(1 meter needed)
|