Final | 6/21/2017 | 6/22/2017 | 6/22/2017 | A | PASS |
James Ady
|
|
|
Swimming pool electrical final. Access granted through gate on right side of residence Phone #: ###-#### Inspection requested via web by Lars Johnson Final ok
|
Electrical Rough-In | 6/13/2017 | 6/14/2017 | 6/14/2017 | A | PASS |
Tom Saunders
|
|
|
(2) Swimming pool light potting
Access granted through gate on right side of residence Phone #: ###-#### Inspection requested via web by Lars Johnson...
ok
|
Electrical Rough-In | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | PASS |
Tom Saunders
|
|
|
Swimming pool EQ bonding plane wiring, (2) volleyball sleeves, (1) bball sleeve Future planter bed power (1/2" conduit), sheer waterfall conduit (1") Phone #: ###-#### Inspection requested via web by Lars Johnson...
bond ring and bond points ok to cover
|
Electrical Rough-In | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | PASS |
Tom Saunders
|
|
|
Remaining ug for swimming pool. Concrete deck will cover all areas where conduit is running. Access granted thu gate on right side of garage. Phone #: ###-#### Inspection requested via web by Lars Johnson...
ok to cover
|
Electrical Rough-In | 4/25/2017 | 4/27/2017 | 4/27/2017 | P | PASS |
Tom Saunders
|
|
|
Swimming pool, partial ug and bonding Phone #: ###-#### Inspection requested via web by Lars Johnson...
ok to cover... stubs for lights and bonding..discussed bonding of metal gazebo and existing concrete on patio...existing concrete ok bonded
|