Final | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | PASS |
Eric Story
|
|
|
Jose Phone #: ###-#### Final ok
|
Electrical Rough-In | 6/12/2017 | 6/12/2017 | 6/12/2017 | P | PASS |
Eric Story
|
|
|
Ceiling... Call to be let in // Jose Phone #: ###-#### Ceiling only ok cover
|
Rough-In Permanent Service | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | CANC |
Eric Story
|
|
|
Jose Phone #: ###-#### No p/s needed
|
Electrical Rough-In | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | PASS |
Eric Story
|
|
|
Jose Phone #: ###-#### Walls on support room ok cover. Transformer in basement ok to energize
|
Electrical Rough-In | 5/1/2017 | 5/1/2017 | 5/1/2017 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### walls only ok cover
|