Final | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | PASS |
Rock A. Hudson
|
|
|
Contact:Paul Wheeler Phone #: ###-#### Inspection requested via web by Deb Gooden Contractor seperated grounded and grounding at permenant service connection. Final ok
|
Permanent Service | 6/5/2017 | 6/8/2017 | 6/8/2017 | A | CANC |
Rock A. Hudson
|
|
|
Paul Wheeler Phone #: ###-#### Inspection requested via web by Deb Gooden Duplicate request
|
Permanent Service | 5/12/2017 | 5/15/2017 | 5/15/2017 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Paul Wheeler Phone #: ###-#### Inspection requested via web by Deb Gooden p/s u/g rec ok
|
Permanent Service | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | FAIL |
Rock A. Hudson
|
|
|
Contact: Paul Wheeler Phone #: ###-#### Inspection requested via web by Deb Gooden 110.22- Disconnecting means shall be identifired as to its purpose. Address and or unit suppied. 110.24- Available fault current shall be posted prior to permenant service inspection. 250.24(A)(5)- A grounded conductor shall not be connected to normally non-current carrying metal parts of equipment. Seperation of grounds and neutrals in old panels which will be sub fed. 250.28- Grounding electrode conductors shall terminate with grounded conductors with main bonding jumper installed. 250.50- All available grounding electrodes described in 250.52 shall be used for grounding electode system. Wireman had not been on interior to confirm metal underground water pipe system. 250.92- Standard lock nuts shall not be only means of bonding metal raceways containing service entrance conductors. Bonding bushings required.
|