Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE17-01299
StatusFinaled
Name TRI STATE ELECTRIC
Site Address 106 N 6TH ST Unit: STE 220
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration: Service Change - 400A 1-Phase
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/23/20176/23/20176/23/2017PPASS
DetailsRock A. Hudson
Contact: Paul Wheeler Phone #: ###-#### Inspection requested via web by Deb Gooden
Contractor seperated grounded and grounding at permenant service connection. Final ok
Permanent Service6/5/20176/8/20176/8/2017ACANC
DetailsRock A. Hudson
Contact Paul Wheeler Phone #: ###-#### Inspection requested via web by Deb Gooden Duplicate request
Permanent Service5/12/20175/15/20175/15/2017APASS
DetailsRock A. Hudson
Contact: Paul Wheeler Phone #: ###-#### Inspection requested via web by Deb Gooden p/s u/g rec ok
Permanent Service5/3/20175/3/20175/3/2017PFAIL
DetailsRock A. Hudson
Contact: Paul Wheeler Phone #: ###-#### Inspection requested via web by Deb Gooden
110.22- Disconnecting means shall be identifired as to its purpose. Address and or unit suppied.
110.24- Available fault current shall be posted prior to permenant service inspection.
250.24(A)(5)- A grounded conductor shall not be connected to normally non-current carrying metal parts of equipment. Seperation of grounds and neutrals in old panels which will be sub fed.
250.28- Grounding electrode conductors shall terminate with grounded conductors with main bonding jumper installed.
250.50- All available grounding electrodes described in 250.52 shall be used for grounding electode system. Wireman had not been on interior to confirm metal underground water pipe system.
250.92- Standard lock nuts shall not be only means of bonding metal raceways containing service entrance conductors. Bonding bushings required.