Final | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PASS |
Rock A. Hudson
|
|
|
UL is on the left hand side as u face it. Phone #: ###-#### Inspection requested via web by Steve VanWinkle Final ok
|
Electrical Rough-In | 3/27/2018 | 3/27/2018 | 3/27/2018 | P | PASS |
Rock A. Hudson
|
|
|
UL is on the left hand side as u face it. Phone #: ###-#### Inspection requested via web by Steve VanWinkle Listing confirmed rough in ok
|