Final | 7/14/2017 | 7/14/2017 | 7/14/2017 | A | PASS |
Rock A. Hudson
|
|
|
Final inspection for shed. I believe permit ELE17-01809 is ready for inspection as well. Contractor was waiting for me to build a wall between equipment area and bathroom. Phone #: ###-#### Inspection requested via web by Dean Perman Final ok
|
Electrical Rough-In | 5/24/2017 | 5/25/2017 | 5/25/2017 | A | PASS |
James Ady
|
|
|
Inspection for conduit cover. Phone #: ###-#### Inspection requested via web by Dean Perman Underground to pool house only ok to cover
|
Conference | 5/25/2017 | 5/25/2017 | 5/25/2017 | P | DONE |
James Ady
|
|
|
Inspection for conduit cover. Phone #: ###-#### Inspection requested via web by Dean Perman Running power to pool house for future pool. Talked about requirements for lighting and receps in pool house.
|