Final | 5/22/2017 | 5/23/2017 | 5/23/2017 | P | PASS |
Mark Moncarr
|
|
|
Customer will be insulating and finishing the wall in garage between parking area and shop. The SER cable in the house is fished into wall and ceiling spaces that are not insulated, except for just above the panel, (less than 2 feet) Customer should be home to let you in Phone #: ###-#### Inspection requested via web by Troy Cobb Ok final
|
Electrical Rough-In | 5/9/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Mark Moncarr
|
|
|
Need inspection on trench, and rough-in for added circuits in garage. There is one circuit for a heater, and 2 plug circuits, all going to a work room in the garage. Phone #: ###-#### Inspection requested via web by Troy Cobb Ok cover. 1 10/2 and 1 12/3 added in garage.
|